Most slow quotations are not caused by a slow factory. They are caused by a drawing that cannot be quoted without guessing. A sintered filter is a pressed and sintered part that is then machined, so the drawing has to answer questions that a machined-only part never asks. Here are the seven items we need, why each one matters, and the mistakes that cost the most time.
The seven items
| # | Item | What it decides |
|---|---|---|
| 1 | Alloy and condition | Powder cost, sintering profile, whether the part can be machined at all |
| 2 | Rating - and its test basis | Powder band, layer structure, price order of magnitude |
| 3 | Dimensions and tolerances | Whether it is pressed to size or machined after sintering |
| 4 | Flatness / parallelism | Whether lapping or double-disc grinding is needed |
| 5 | Connection detail | Standard fitting from stock, or a bespoke machined ring |
| 6 | Finish, marking, cleaning | Extra operations, and whether ultrasonic cleaning is required |
| 7 | Quantity and test requirements | Setup amortisation, sample plan, third-party reports |
1. Alloy and condition
Write the alloy as a standard designation, not a trade name: 316L, 304, 310S, titanium TA1 (see note below on ASTM equivalents), Inconel 600 or 625, Monel 400, Hastelloy C276 or C22. Add the condition if it matters - annealed, pickled, passivated. "Stainless steel" alone forces us to ask, and asking costs a day each time.
On titanium: Chinese mills supply TA1, TA2 and TA3; overseas buyers specify ASTM Grade 1, 2 or 3. TA1 corresponds to Grade 1 in practice (unalloyed, low oxygen), but the equivalence should be stated on the drawing if your quality system audits it.
2. Rating - and its test basis
A micron number without a method is not a specification. Write it as, for example, "absolute rating 5 μm, verified by bubble point" or "nominal 10 μm, typical". The three common bases are explained in this article, and they can differ by a factor of two or three on the same part. If your process only needs "no visible carry-over", say that - it may let us quote a cheaper structure.
3. Dimensions and tolerances
Sintered parts shrink during sintering - typically 1 to 3 percent depending on alloy and density - so a tight tolerance on an as-sintered dimension is either impossible or expensive. The practical rule:
- Tolerances of ±0.5 mm or looser: can usually be held as sintered.
- Tolerances tighter than ±0.2 mm: the feature should be machined after sintering - which means the drawing must leave stock for machining.
- Datum: give one. "Flat and parallel" without a datum cannot be inspected.
4. Flatness and parallelism
Filter plates are often stacked or clamped against a housing face, so flatness is a sealing requirement, not a cosmetic one. State it as a number: "flatness 0.1 mm over 100 mm" tells us lapping may be needed; "must be flat" tells us nothing. For thick plates used as support layers, parallelism between faces matters as much as flatness.
5. Connection detail
This is where quotations diverge most. A 304 threaded fitting in a common size can often be bought from stock and welded on. The same fitting in 316L is less available; in Hastelloy or Monel it is almost always machined from bar - cut, turned, threaded, and often a custom thread or a sealing groove that exists only on your drawing. Write the thread standard explicitly (G 1/2, NPT 1/2, M20×1.5), the sealing face type (flat gasket, O-ring groove, conical seat), and whether the connection is welded or replaceable.
6. Finish, marking, cleaning
State whether the part must be ultrasonic-cleaned and packed for a cleanroom, whether edges must be deburred or radiused ("sharp edges removed" is enough for most industrial use), and what marking is required - part number, revision letter, heat number, or a customer logo. Marking a sintered surface is not like marking a machined one: laser marking on the porous face can create a local sealed zone, so we normally mark on the machined rim.
7. Quantity and test requirements
Quantity drives setup amortisation. Ten pieces and one hundred pieces of the same part can differ by a factor of two in unit price, because the drawing interpretation, programme and first-article inspection are the same. Also state the test level: certificate of material only, or bubble point and permeability per batch, or a third-party report from an accredited laboratory.
The four mistakes that cost the most time
- Rating without a method - we quote nominal, you expected absolute, the sample "fails" in your test.
- Tolerance tighter than the process - a ±0.05 mm as-sintered thickness is a conversation, not a quotation.
- No datum - inspection becomes an opinion.
- Drawing revision not stated - two versions circulate, and parts get made to the wrong one.
A drawing we can quote in one pass
Two views, one section, a datum, alloy per standard, rating with method, tolerances that respect sintering, connection detail with thread standard, quantity, and the test level you need. That is enough for a same-week quotation. If you have a sketch instead of a drawing, send it - we will mark it up with the questions and send it back, which is usually faster than a week of email.
Questions we get asked
- Can you work from a sample instead of a drawing?
- Yes. Send the sample and we will measure it and produce a drawing for your approval before production. The approved drawing then becomes the reference for inspection, so both sides are measuring the same thing.
- What tolerance can you hold on an as-sintered surface?
- As a rule of thumb, ±0.5 mm on thickness and ±0.3 mm on in-plane dimensions for plates, depending on alloy and density. Anything tighter is machined after sintering, which needs stock left on the drawing.
- Do you need the CAD file?
- A PDF drawing is enough to quote and to produce. STEP is helpful for complex connections because it removes ambiguity about curved sealing faces, but it is not a requirement.
- How fast can you quote a complete drawing?
- Within two working days for plates and discs, longer if a bespoke connection has to be priced with the machine shop. Incomplete drawings take longer because of the questions, not the calculation.
Include the medium, working temperature and pressure - they often change the recommended alloy, and it is better to discuss that before the part is made. [email protected]